20 March - 2025

Project Overview:

  • Location: Jalisco, Mexico

  • Purpose: Agricultural irrigation

  • Geomembrane type: 1.0mm HDPE anti-seepage membrane

  • Area: Approximately 10,000㎡

Construction Steps:

  • Base preparation: Clean the bottom of the pond, tamp the foundation, remove stones and tree roots, and ensure that there are no sharp objects on the ground.

  • Geomembrane laying: Use mechanical laying method, unfold according to the shape of the pond, and reserve space for thermal expansion and contraction.

  • Welding and testing: Use double-track hot wedge welding machine for welding, and perform air pressure test to ensure the quality of the weld.

  • Anchoring and protection: The edge is buried in the anchoring ditch, and the bottom of the pond is covered with a layer of fine sand to protect the membrane surface.

Effect:

The pond has successfully achieved zero leakage, improved the storage capacity of irrigation water, and reduced water resource loss.